KBN Shakedown Report: KPUB board to review a separation agreement for CEO Mike Wittler
KPUB's board will review a CEO separation agreement behind closed doors, an item added after Draft 4. Plus: UGRA cuts flood-gauge installation 75% and seeks open-ended easement power, Headwaters tests for radium but its new plan doesn't, and Kerr County's broker problem.

KPUB CEO Mike Wittler on left with Kerrville Mayor Joe Herring on right, who was appointed to KPUB’s Board of Trustees May 15, 2024
The Shakedown Report is KBN's weekly roundup of what Kerr County's governments are deciding, spending and keeping out of view. Items come from posted agendas, minutes, budgets and bid documents.
KPUB's board will review its CEO's exit, behind closed doors
The Kerrville Public Utility Board will meet in closed session at 8:30 a.m. Wednesday, Nov. 18, to "Review CEO Separation Agreement." KPUB's CEO is Mike Wittler. KBN found no announcement from KPUB or the City of Kerrville about a leadership change.
The item is listed under the Texas Open Meetings Act's personnel exception, Section 551.074. A second personnel item covers "Duties and Compensation Benefits for the General Manager and CEO."
The separation item was added late. On Nov. 12, KPUB uploaded a version of the agenda marked "Draft 4" and, 13 minutes later, a final version. The separation agreement is not in Draft 4. It appears only in the final, along with the Winter Storm Uri item, six closed-session items on "competitive matters," and an attorney consultation with no subject given.
The agenda doesn't say whether Wittler is resigning, retiring or being let go, or whether the agreement includes severance. State law lets a board discuss an employee in private. It does not let the board vote in private: any final action on the agreement has to be taken in open session. A signed agreement that spends public money is a public record.
A week earlier, KPUB called a special joint meeting for 7:30 a.m. on Veterans Day, Nov. 11. Nearly the whole agenda was in closed session, covering wholesale power, hedging and generation. The one open item, directors and officers liability insurance, needed no vote. The renewal came in at $98,279.99, which is $1,720 under the $100,000 level that requires board approval.
Wittler is also treasurer of the Kerr Economic Development Corporation, a seat KPUB reappointed him to in September. KPUB also helps fund KEDC.
Wednesday's agenda also includes:
- A Winter Storm Uri bill, still open five years later. The board will consult its lawyer, in closed session, on pending or contemplated litigation over a "Final Invoice from February 2021 (Winter Storm Uri)." The agenda doesn't say who sent the invoice or for how much.
- A change-order policy rewrite, in closed session. Under Section 551.086, the law that lets public power utilities protect competitive information, the board will take up "Revisions to Public Facility Corporation Change Order Policy." Change-order rules govern how much a contractor's price can grow after a contract is signed.
- Contracts on consent, with no dollar figures. The consent agenda, which passes in one vote unless a board member objects, includes an engineering contract for a new subdivision on Hwy 16 and a change order on the Airport Feeder Tie construction contract. Neither the agenda nor any posted document names the vendor, the developer or the amount. KPUB had not posted a board packet for the meeting as of Monday.
- A notice you can barely read. The City posted the official agenda on its meeting portal as a tilted phone photo of a paper copy, with a note that its "email connection [was] down." Several captions are cut off or blurred. That photo is still the City's posted agenda. KPUB posted a legible version on its own website.
Wednesday, Nov. 18, 8:30 a.m., KPUB offices, 2250 Memorial Blvd. Public comment is at the start of the meeting.
UGRA wants its GM to sign permanent easements for flood gauges, with no price limit
The Upper Guadalupe River Authority board meets at 3 p.m. Wednesday, Nov. 18. It will be asked to pass Resolution 2026-50, authorizing its general manager to negotiate easements with landowners for water-level gauges, part of the flood-warning system being built after the July 4, 2025 flood.
The resolution's title says the GM may "negotiate." The text goes further. Section 2 lets the GM "negotiate easement terms, and execute final easements." Section 3 lets the board president sign instead. Section 4 keeps the authority in place "until rescinded." The resolution sets no price limit and no appraisal requirement, and lists no sites or landowners. Individual easements would not come back to the board for a vote. The easement form goes to UGRA's four-member Flood Prediction and Control Committee, not the full board.
In September the board approved revocable license agreements for gauges. According to the staff memo, Kerr County asked in October that UGRA obtain permanent easements instead for any gauge on private land that triggers a siren.
UGRA cuts gauge installation 75% and shifts flood money
On the same agenda, UGRA will amend the FY2027 budget it adopted Sept. 16. All three changed lines are flood money:
- Flood grant revenue drops by $943,962 (−14.8%).
- Flood grant pass-through spending drops by $1,277,324 (−23.8%).
- UGRA's own Flood Prediction and Control line rises by $633,826, an 85% increase, to $1,383,217.
UGRA's planned surplus for the year shrinks from $367,126 to $66,662.
The board packet's line-item breakdown shows the grant-funded budget for installing stream gauges falling from $1,388,000 to $353,881, a 75% cut. A new $30,000 line pays for easement surveys. $533,826 for rain gauges moves off the state grant and onto UGRA's own money. The staff memo says the grant changes were made "to coincide with the scope of SB3 Project Plan 3," Kerr County's latest request to the Texas Water Development Board, which has not acted on it.
Through Sept. 30, UGRA had received $937,500 in state SB 3 flood-grant advances and spent $162,488, about 17%.
UGRA's September minutes report that Kerr County will now lead the remaining siren installations, contracting with Waterway Engineering, while UGRA handles SB 3 reimbursements.
Waterway Engineering is the firm examined in the Floodgate Report's 4-Way Finding. That report documents the emergency contract Commissioner Rich Paces signed with the firm after the July 4, 2025 flood, hourly and not to exceed $30,000, and tests Waterway's model of that flood.
In September the board also voted 5-0 to pay the 25% local share of repairs to two NRCS flood-control dams on private land, K-7 and K-8, from its Flood Prediction and Control fund, "contingent upon execution of agreements with the landowners." UGRA's September board packet, which is no longer posted on its website, described K-7 as having "large voids under the structure." The landowners have not been named.
UGRA posted the approved minutes of that Sept. 16 meeting on Nov. 12, eight weeks later. The October minutes are still not online as a standalone document; a draft is in the November packet.
UGRA adds its flood engineers to its no-bid list
The packet also rewrites UGRA's procurement policy. It adds seven engineering firms to UGRA's pre-qualified professional-services list, including three already doing UGRA's flood work: WEST Consultants, IR Squared Engineering and EDGE Engineering. Firms on the list can receive professional-services contracts under $50,000 without a request for qualifications. A separate section lets the GM exempt contracts over $50,000 from a formal RFQ.
The same packet records an after-the-fact "donation" of about 700 feet of flood-damaged fence, valued at $187, to the contractor who hauled it away in February.
Wednesday, Nov. 18, 3 p.m., UGRA, 125 Lehmann Drive.
Kerr County: one broker on both sides of the property swap
Kerr County is buying the old police building at 429 Sidney Baker from the City for about $1.5 million. Brinkman Preferred Properties is the City's listing broker on that sale. On Oct. 13 the Commissioners Court ratified, after it was already signed, an "Intermediary Relationship Notice" with Brinkman. That notice lets one brokerage represent both buyer and seller.
The County is now picking a broker to sell its property at 500 Hayes. The Oct. 26 minutes show two firms responded: Brinkman and Sherman & Co., Realtors.
On Sept. 28, the court created the broker selection committee 4-0-1, with Kerr County Judge-elect Tom Jones abstaining. Jones was then named to the committee. By Oct. 26, the minutes referred the bids to a committee "formed via Court Order 41972." The Oct. 26 agenda listed a four-member version. That makes three versions of the committee for one property sale.
Kerr County signs first, votes later
The 429 Sidney Baker purchase came with due-diligence contracts that were signed before the court voted on them. On Oct. 13 the court ratified a Raba Kistner agreement for a "forensic structural distress assessment" of the building and a Clean Environments mold-consulting proposal (Orders 42226–42228). The structural report has not been made public.
The broker selection and the Flat Rock Dam engineering pick are expected on the Nov. 23 Commissioners Court agenda, which had not posted as of Monday.
EIC: James Avery's traffic signal costs $20,000 more than approved
The City's Economic Improvement Corporation meets at 4 p.m. Monday, Nov. 16. It will hold a hearing on a sales-tax-funded traffic signal at James Avery Craftsman on Hwy 27. In May 2024 the EIC approved it at "not to exceed $140,000." The first draft of the agenda said $140,000. The final version says $160,000 and recasts the deal as a "Project Funding Agreement" with the City.
The staff memo says a TxDOT acceptance letter is attached. The packet lists "Exhibits: None."
The same agenda asks the board for "direction on use of" roughly $2 million in Granger MacDonald Park bond money, with no backup material. It also includes a $375,000 grant to KEDC, where Wittler is treasurer.
Headwaters: a radium testing project, and a new plan that doesn't test for radium
The Headwaters Groundwater Conservation District holds a public hearing at 1:30 p.m. Tuesday, Nov. 17, on a revised district management plan, and may adopt it at a special meeting immediately after. The same agenda includes a general manager's "Update – Radium Water Quality Testing Project."
The 149-page proposed plan does not mention that project. The water-quality analysis it requires for every new well covers e. coli, total coliforms, chloride, conductivity, fluoride, hardness, iron, nitrate, pH and total dissolved solids. It does not include radium. That list is unchanged from the district's 2021 plan. Well owners are notified only when bacteria or "injurious water" is found. HGCD minutes first record a "Radionuclides Project" update in February 2026. No results have been posted.
The plan does not mention the July 4, 2025 or July 16, 2026 floods. It repeats that "land surface subsidence has not been observed in the District" and that its subsidence goal "is not applicable at this time."
It wasn't always this way. After the Guadalupe reached 100-year flood levels in July 1987, UGRA's environmental health department warned that flooded wells could spread typhoid and dysentery, citing paratyphoid and gastrointestinal cases blamed on contaminated Kerr County wells after the 1978 flood. UGRA offered free test kits and lab analysis to every owner of a flooded well for the rest of that month.
HGCD also replaced its special-meeting agenda online on Nov. 12. The new version drops "Approval of Paying of the Bills" but still carries the original certification saying it was posted Nov. 10.
Tuesday, Nov. 17, 1:30 p.m., HGCD, 125 Lehmann Drive, Suite 202.
Airport board posts a blank-check closed session
The Kerrville–Kerr County Joint Airport Board meets at 8:30 a.m. Wednesday, Nov. 18. Its agenda lists seven possible grounds for closing the meeting (legal advice, real estate, personnel, economic development and more) without naming any subject. Texas courts have held that closed-session topics must be described specifically enough to inform the public.
What to watch
- Mon. Nov. 16, 4 p.m.: Kerrville EIC (James Avery signal, KEDC $375K, park bond money)
- Tue. Nov. 17, 1:30 p.m.: HGCD management plan hearing, possible adoption, radium testing update
- Wed. Nov. 18, 8:30 a.m.: KPUB (CEO separation agreement, Uri invoice, contracts)
- Wed. Nov. 18, 3 p.m.: UGRA (gauge easements, gauge cut, budget amendment, procurement rewrite)
- Mon. Nov. 23, 9 a.m.: Kerr County Commissioners Court (expected: 500 Hayes broker, Flat Rock Dam engineer)
Have a document, a tip or a correction? Contact Kerrville Breaking News.



